Power Disconnection and Reconnection St George
Permanent disconnections before demolition and temporary ones for re-roofing, rendering and switchboard work.
Your main switch turns off the circuits in the house, but the service line, the bracket and the mains up to the meter board stay live. Anyone working near them needs the supply isolated at the network side. In St George, with so many demolitions, duplex builds and re-roofs going on, power disconnection and reconnection is one of our most common jobs.
Demolitions and duplex rebuilds
Before an excavator touches a house, the supply has to be permanently disconnected. We isolate it, remove the service and leave the site safe. If the builder needs power for the build, we set up a temporary builders supply on the same visit, so there’s no gap. On duplex sites we also plan where the two new supplies will come in, so the temporary pole doesn’t end up in the way of a future driveway.
Re-roofs and renders
St George has thousands of bungalows with original terracotta roofs, and many are being replaced with Colorbond. Roofers work right next to the raiser and service line, so the supply needs to be off while they do. The same goes for painters and renderers on scaffold near a front bracket. We disconnect for the days they need, then come back and reconnect. If the raiser or bracket is rusty or low, we fix it at reconnection with a point of attachment upgrade.
Switchboard and meter work
When your electrician replaces the switchboard, moves the meter board or upgrades the main switch, the network supply needs to be isolated. We coordinate with them so the disconnection, their work and the reconnection all happen in one day.
Temporary or permanent
- Temporary: supply off while work happens, then reconnected and tested.
- Permanent: supply removed for demolition or when a building is no longer needed.
Shared supplies and battle-axe lots
On battle-axe blocks and some older pairs of semis, one service can feed more than one home, or a private pole can carry supply to the rear house. We check before booking, so neighbours or tenants are told in advance.
Permanent removal for demolition
For a demolition the service is not just switched off but removed, and the network side is made safe so machinery can work around the boundary. We confirm with you and the builder that nothing else on the block, such as a granny flat or a neighbour’s supply, runs through the same connection before we remove it.
For builders
We work with St George builders on duplex and knockdown projects every week. Send the address, the job type and your dates. We’ll book the disconnection, any temporary supply and the final connection around your program, and provide paperwork for your site safety plan.
Timing and notice
A planned disconnection usually takes less than an hour on the day, and a reconnection about the same. What takes time is lining up the dates: the Ausgrid notification and your trades’ schedule. A few days’ notice lets us book the day your roofer or demolition crew actually needs, rather than the next free slot. When the same visit can also cover a new raiser, a mains upgrade or a meter board move, we combine them so you only lose power once.
Tenants and neighbours
If the property is tenanted, or a neighbour shares the supply, we can give you a short written notice with the date and expected time without power so you can pass it on. On battle-axe blocks where the rear house is fed through the front property, both owners need to know before the day.
Book a disconnection
Call your St George level 2 electrician team to lock in dates. For an immediate safety issue, use our 24/7 emergency level 2 electrician line.
Updated
What good power disconnection and reconnection looks like
Power Disconnection and Reconnection across St George
Power Disconnection and Reconnection in St George: step by step
- Lock in datesWe agree dates with you and your builder or roofer, so nobody's waiting.
- Lodge the noticeWe notify Ausgrid before any work on the supply.
- Isolate safelyWe disconnect at the pole, pit or point of attachment and make the line safe.
- Reconnect or removeTemporary jobs are reconnected and tested; demolitions get the service removed.
Power Disconnection and Reconnection questions in St George
Something else on your mind? Call 02 9158 9911 and ask.
Our builder says the house needs to be disconnected before demolition. What's involved?
A permanent disconnection removes the supply at the network side and makes the service safe so machinery can work. We book it in before the demolition date and can set up site power at the same time.
Can we stay connected while the roof is replaced?
Usually the supply is disconnected for the days the roofers work near the line and reconnected when they're done. We coordinate with the roofer's schedule.
Does turning off the main switch make it safe?
No. The service line and mains up to the meter board stay live. Work near them needs the network side isolated.