Three Phase Power Upgrade St George
Enough capacity for ducted air, EV charging, pools, induction kitchens and a second dwelling, on the Ausgrid network.
Most St George homes were connected on single phase power, which was plenty for the houses of the 1930s to the 1970s. Today’s homes and rebuilds ask much more of the supply. Ducted air conditioning, induction cooking, a pool, an EV charger, a big solar system and sometimes a second dwelling all compete for the same connection. A three phase power upgrade spreads that load across three supply phases so everything can run without tripping or straining the mains.
When three phase makes sense
- You’re building a new home or duplex with ducted air on each level
- You want a fast EV charger and already run ducted air and a pool
- A granny flat is going in with its own air conditioning and kitchen
- The main switch trips when the big appliances run together
- Your solar installer needs three phase for the system size you want
Sometimes the real problem is old or small cable. A consumer mains upgrade on single phase may be enough, and we’ll say so if it is.
How it works with Ausgrid
Three phase starts with a connection application to Ausgrid. That tells us whether three phase is available from the street mains at your address and whether any network work is needed first. Most St George streets carry three phase on the overhead mains, but some side streets and battle-axe lots don’t, and that affects the plan.
Once approved, we install new three phase consumer mains from the point of attachment or boundary pit to the meter board. Your retailer arranges the three phase meter, and your electrician fits the main switch and circuit protection. On connection day we disconnect, connect all three phases, check they’re balanced, test and reconnect. You get a certificate of compliance.
Three phase for rebuilds and duplexes
On a knockdown rebuild or duplex, plan three phase at the start. We lodge the application early so approval is through well before the house is finished. While the trench is open for an overhead to underground conversion, the three phase cable goes in at the same time, so there’s no second dig.
Duplexes often need two supplies. We work out with your builder whether each dwelling needs three phase or whether one can stay single phase, which affects both cost and the application.
Granny flats
Granny flats are everywhere in St George, and many are built on the same supply as the main house. That’s fine for a small flat, but a flat with its own ducted air and cooking can tip the whole property over its capacity. A three phase upgrade fixes that at the source.
Working with your electrician
We handle the network side: application, mains, connection and certification. Your electrician handles the switchboard and circuits. We coordinate so the connection happens on the day the board is ready.
How long it takes
The work on connection day is usually a single visit. The time is in the approval and metering: Ausgrid’s assessment, any network work in the street, and the retailer’s meter change. Lodging early, before the ducted air or EV charger arrives, means the supply is ready when the equipment is.
Get a price
Call your St George level 2 electricians to check your supply and get a fixed written price. We do a lot of three phase work in level 2 electrician Blakehurst and Kogarah.
Updated
What good three phase power upgrade looks like
Three Phase Power Upgrade across St George
Three Phase Power Upgrade in St George: step by step
- Work out the loadWe look at what you run and what's planned, and tell you whether three phase is actually needed.
- Apply to AusgridWe lodge the application so Ausgrid confirms three phase is available at your address.
- Install the mainsNew three phase consumer mains go in, and your retailer arranges the three phase meter.
- Connect and balanceWe connect all three phases, test, reconnect and certify.
Three Phase Power Upgrade guides for St George homeowners
Three Phase Power Upgrade questions in St George
Something else on your mind? Call 02 9158 9911 and ask.
Do we need three phase for a granny flat?
Not always. A small granny flat can run from a single phase supply that has been upgraded properly. Bigger flats with their own ducted air and cooking often justify three phase. We work it out with your electrician.
Will three phase help our solar system?
It can allow a larger inverter and export limits that suit a bigger system, depending on Ausgrid's rules for your connection. Your solar installer can confirm what they need.
How long does approval take?
It varies. Lodging early, before the equipment is installed, means the supply is usually ready when you need it.