Skip to content
Underground power conduit being laid to a new duplex in St George
Level 2 electrical

Overhead to Underground Conversion St George

A new underground supply from the street to your meter board, ideal for duplexes, rebuilds and second storeys.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

An overhead service line is the black wire running from the street pole to the bracket on your house. Most St George homes still have one, and for decades nobody thought about it. Then a duplex goes up next door, a second storey is planned, or a storm drops a branch on it, and suddenly the wire is the problem. An overhead to underground conversion replaces it with a cable in conduit under the ground, from the street to your meter board.

Why St George owners go underground

  • Duplex and rebuild projects. New dwellings with two-storey walls, new roofs and driveways rarely suit the old overhead route.
  • Second storeys. Adding a level often leaves the line too close to the new roof or windows.
  • Trees. Jacarandas, brush box and old gums along streets in Bexley, Oatley and Penshurst grow into service lines.
  • Salt and wind. Bayside homes in Sans Souci, Ramsgate and Brighton-Le-Sands get salt-laden wind that is hard on fittings.
  • Looks. A rendered new home looks better without a wire across the front.

How the connection works

Most St George streets are still fed by overhead Ausgrid mains. There, the usual method is to run the underground cable to the base of the nearest suitable pole and up the pole inside a protective conduit, where it connects to the mains. In newer developments and some redeveloped streets around Hurstville and Kogarah, the mains are underground already and we connect at the pit at the boundary. We confirm which applies before quoting, so the price holds.

The trench

St George blocks are usually wider and longer than in the inner suburbs, with a front lawn, a concrete driveway and sometimes a brick fence. The trench runs the shortest sensible path from the connection point to the meter board, with heavy-duty conduit at the required depth and marker tape above. We cut and patch concrete neatly, or bore under paths where it suits. If landscaping is happening anyway, we time the trench to go in first.

While the trench is open, it’s the right time to size the cable for the future. Many owners pair undergrounding with a three phase power upgrade, or replace old mains with a consumer mains upgrade in the same job.

On connection day

We lodge the notification with Ausgrid, isolate the supply, pull in and terminate the new cable, test and reconnect. Then the old overhead line and bracket come down. You get a certificate of compliance for the work.

Underground power for duplexes

Duplex projects across Hurstville, Beverly Hills, Kingsgrove and Peakhurst often need two separate supplies. We plan both from the start, coordinate with your builder and lodge the applications early, so each dwelling is connected as soon as its meter board is ready. Site power during the build can come from a temporary builders supply.

How long the job takes

The trench and conduit usually take a day, sometimes less on a short front yard. The connection itself is another visit, booked once Ausgrid’s requirements are confirmed, and your power is off for a few hours that day.

Get a quote

Call your St George level 2 electrician to plan the route and get a fixed written price. We regularly underground homes in level 2 electrician Hurstville and Kogarah.

Updated

Underground conversions are priced on trench length, surfaces to cut and restore, the connection point at the street and any Ausgrid requirements. We confirm the method on site and give you a fixed price.

What good overhead to underground conversion looks like

Close-up of overhead to underground conversion on a home in the St George area
What overhead to underground conversion looks like up close on a typical St George area home.
Signs that overhead to underground conversion needs attention
Typical signs that it needs attention.

Overhead to Underground Conversion in St George: step by step

  1. Look at the routeWe find the street connection point and plan the shortest practical trench to your meter board.
  2. Confirm with AusgridWe confirm whether the connection is at a pit or up the nearest street pole.
  3. Lay the conduitHeavy-duty conduit goes in at the required depth with marker tape, then the trench is backfilled.
  4. Connect, then remove the lineWe pull in the cable, connect, test and reconnect, then take down the old overhead line.

Overhead to Underground Conversion questions in St George

Something else on your mind? Call 02 9158 9911 and ask.

We're building a duplex. Should the new supply go underground?

For most duplexes it's the best option. Two dwellings usually need two supplies, and running them underground avoids overhead lines across the new driveways and roofs. We plan it with your builder.

Can you go under our existing concrete driveway?

Yes. We saw-cut a neat strip and patch it, or bore under where that's practical. If you're replacing the driveway anyway, it's cheaper to trench first.

Does every street in St George have underground mains?

No. Most streets still have overhead mains on poles, so the new cable usually runs up the nearest suitable pole in conduit. Newer developments often have pits.

Need a Level 2 electrician in St George?

📞 Call now Free quote