Every duplex, knockdown rebuild and major extension needs site power from the first day. Running leads from a neighbour or relying on generators slows the trades and creates safety issues. A temporary builders supply gives your site a proper metered connection to the Ausgrid network, with safety switches and outlets for tools, lighting and the site shed.

What gets installed

Most St George residential sites use a temporary pole or a freestanding site board near the front boundary, carrying the meter, main switch, safety switches and weatherproof outlets. The supply connects overhead from the nearest street pole or underground from a pit where the street has underground mains. We place it where it won’t block excavation, concrete trucks or scaffolding, which on a duplex site with two driveways takes some planning.

The order that saves time

The smoothest builds follow this order:

  1. Permanent disconnection of the old house before demolition
  2. Temporary supply installed the same visit
  3. Build proceeds on site power
  4. Permanent supply connected to the new meter board
  5. Temporary supply removed

Our power disconnection and reconnection page explains step 1. If the finished home will be on three phase power, lodge that application early and consider starting the site on three phase too.

What we need from you

  • Site address and builder contact
  • Site plan or a quick sketch of where things will go
  • Single or three phase
  • Start date
  • A retailer account for the site (we tell you what to ask for)

Duplex builds

Duplexes are the most common build type in large parts of St George. One temporary supply usually runs the whole site, but the final connections are separate. We plan both permanent supplies from the start, often underground, so the temporary pole sits somewhere that won’t clash with either new driveway.

Moving the temporary supply mid-build

Sometimes the temporary pole needs to move partway through a build, for example when the driveway is about to be poured or landscaping starts. We can relocate it with a short disconnection, as long as we know a few days ahead.

At the end

Once the new meter boards are in and the electrician is done, we connect the permanent supply, test and certify, then remove the temporary pole or board. If you’re going underground for the finished home, the overhead to underground conversion is done before landscaping and the driveway pour.

Common hold-ups

Most delays with site power come from paperwork, not the work itself. The retailer account isn’t set up, so there’s no meter. The temporary pole is where the excavator needs to dig. The build needs three phase but single phase was requested. Or demolition is booked before the old supply has been disconnected. We go through each of these with you and the builder at the start and give you a short checklist, so the power is on from the first day of the build rather than a week of generators.

Safety on site

Temporary supplies get knocked by machinery, rained on and moved around. We install them to cope with that, with the safety switches and protection the rules require. If your site has an overhead line near the work area, we can advise on keeping cranes, concrete pumps and scaffolding clear of it.

Book site power

Builders across level 2 electrician Kingsgrove, Beverly Hills and Hurstville use us for site power. Call the level 2 electrician St George team to book.

Updated

Temporary supply is priced on the pole or board type, single or three phase, the connection point and how the supply will be removed or swapped to permanent at the end. We confirm on site.

What good temporary builders supply looks like

Close-up of temporary builders supply on a home in the St George area
What temporary builders supply looks like up close on a typical St George area home.
Signs that temporary builders supply needs attention
Typical signs that it needs attention.

Temporary Builders Supply in St George: step by step

  1. Plan the spotWe look at the site plan and pick where the temporary supply won't get in the way.
  2. Book it inWe lodge what Ausgrid needs and tell you what to ask your retailer for the meter.
  3. Install and connectWe stand the temporary pole or board, connect it and test it.
  4. Swap to permanentAt handover we connect the new home and remove the temporary supply.

Temporary Builders Supply questions in St George

Something else on your mind? Call 02 9158 9911 and ask.

Can one temporary supply run a duplex build?

Usually, yes. One site supply can run both halves of a duplex during construction. The permanent supplies for each dwelling are connected at the end.

Who sets up the meter?

The site needs an electricity retailer account so a meter can be fitted. We tell you exactly what to request.

What if the temporary pole gets hit?

Keep everyone clear and call us. We make it safe and repair or replace it.