Point of Attachment Upgrade St George
New brackets and raisers for second storeys, re-roofs, carports and lines that sit too low.
The point of attachment is where the overhead service line from the street pole is fixed to your house. On a typical St George bungalow it’s a bracket under the front eave or a galvanised raiser poking above the terracotta roof. It carries the full tension of the line, and it decides how high that line sits over your driveway, path and roof.
When it needs attention
- Second storeys. A new upper floor can put the old bracket in the middle of a wall or too close to new windows.
- Re-roofs. Swapping terracotta for Colorbond, or changing the pitch, often means the raiser has to come out and go back in.
- Carports and driveways. A new carport or raised driveway can bring the line too low. The Service and Installation Rules of NSW set minimum clearances over driveways, footpaths and roofs, and Ausgrid can issue a defect when they’re not met.
- Rust and wind. Old brackets rust, especially near the bay, and fixings work loose in old brick and render.
- Damage. Trucks, trees and builders’ equipment catch the line and pull the fitting.
If a bracket has pulled out or the line is hanging low, keep clear and call our emergency level 2 electrician service.
Brackets, raisers and positions
On a two-storey home or a tall wall, a new bracket fixed into sound brickwork is usually enough. On single-storey bungalows with low eaves, a raiser is the standard answer, fixed to take the line tension and lift the attachment clear of the roof. We place it where the line has a clean, compliant path from the street pole and where it doesn’t spoil the front of the house.
For homes near the water in Sans Souci, Ramsgate and Blakehurst, we pay extra attention to corrosion protection on the hardware.
Doing it with the rest of the job
Moving the attachment nearly always means extending or replacing the mains from the bracket to the meter board. If the mains are old, a consumer mains upgrade at the same time saves a second visit. If you’re renovating, we handle the power disconnection and reconnection for your builder, then reconnect to the new bracket when the walls and roof are done.
If the line is in the way more than it’s worth, compare the cost of going underground. Many St George owners doing a second storey decide the wire should go altogether.
On the day
We lodge the notification with Ausgrid, disconnect, fit the new bracket or raiser, extend the mains and move the service line across. Then we reconnect, test and certify. Most jobs are done in half a day.
Clearances in plain terms
The rules set minimum heights for the line over footpaths, driveways and roofs, and distances from windows and balconies. They exist because a low line can be hit by a truck or reached from a ladder or deck. If you’re planning a deck, pool or balcony near where the line runs, tell us early so the attachment is placed right from the start.
Get a price
Call your St George level 2 electrician for a site visit and a fixed written price.
Updated
What good point of attachment upgrade looks like
Point of Attachment Upgrade across St George
Point of Attachment Upgrade in St George: step by step
- Measure the lineWe check how high the service line sits over the driveway, footpath and roof, and the bracket's condition.
- Choose the positionWe pick a spot that gives proper clearance and suits your build and the look of the house.
- Fit and transferWe install the new bracket or raiser, extend the mains and move the service line across.
- ReconnectWe reconnect to the Ausgrid network, test and certify the job.
Point of Attachment Upgrade guides for St George homeowners
- Overhead vs underground power for St George homes: which suits your rebuild or renovation?The trade-offs between keeping an overhead service line and going underground, and how the choice plays out on St George bungalows, duplexes and rebuilds.
- Who owns the power line to my house? A St George guide to what's yours and what's Ausgrid'sWhere Ausgrid's responsibility ends and yours begins, from the street pole to the meter board, and what that means when something breaks.
Point of Attachment Upgrade questions in St George
Something else on your mind? Call 02 9158 9911 and ask.
We're re-roofing our bungalow. Does the bracket need to move?
Not always, but roofers need the line disconnected to work safely, and a re-roof is a good time to fix a rusty or low raiser. We check it when we do the disconnection.
What's a raiser?
A galvanised steel pipe fixed to the wall or through the roof that lifts the attachment point above the roofline. It's the usual fix on single-storey homes where the eave is too low.
Can the line attach to a new carport?
No. The attachment has to go on a structure designed to carry the line's tension. We find a compliant spot on the house instead.